Home charger supply and install in Lilydale 3140 — Tesla, BYD, Polestar, Kia and more. Fixed on-site quotes, neat installs, certified to AS/NZS 3000. Local distributor: AusNet.
EV charger installation in Lilydale 3140 should be planned around the home's actual driving routine, available supply and switchboard capacity. Carbon Group Electrical installs Teltonika EVC2, Tesla Wall Connector and other EV chargers on the AusNet network, with single-phase or three-phase options, neat garage cabling, app setup and certification under REC 35801 and A-Grade A62716.
Every install is certified under REC 35801 / A62716 and meets AS/NZS 3000 and manufacturer specs.
Most Lilydale homes done in 3–4 hours. Weekend bookings available at no extra charge.
On-site assessment first, one number, no "while-I-was-here" surprises.
We install all major EV charger brands. CEC-approved installers, manufacturer warranties honoured.
Bought a charger from Bunnings? We install DeWalt, Tesla, Arlec and Deta units — just bring it home and book in.
2-minute form — tell us your car and garage layout.
We check your switchboard, cable run, and Wi-Fi.
Usually 3–4 hours. Concealed cable run, tidy finish, RCD protection.
App pairing, demo, 12-month workmanship warranty + manufacturer warranty.
Concealed cable runs through the wall cavity or roof space, a dedicated RCBO on the switchboard, weather-rated housing on exterior installs, and a neat final finish. No visible conduit snaking down brickwork.
We commission on-site, pair the charger to your phone app, and show you how to schedule off-peak charging before we leave.
Most Lilydale 7kW single-phase installs sit between $1,450 and $2,400 supply-and-install. Price depends on cable distance, switchboard condition, and whether an RCBO or load-management device is needed. We give you a flat quote on-site before any work starts.
Not necessarily. 7kW single-phase chargers cover 95% of Lilydale homes and give about 40km of range per hour of charging — plenty for overnight. 22kW 3-phase is only needed if you drive long distances daily or already have 3-phase to the house.
Yes — we install Tesla Wall Connectors for Model 3, Model Y, Model S and Model X across Lilydale 3140. We're Clean Energy Council approved and comply with Tesla's install guidelines.
A straightforward single-phase install takes 3–4 hours. 3-phase or long-cable-run jobs can take 5–6 hours. We work weekends at no extra charge.
Lilydale is on the AusNet network. We handle all distributor paperwork on your behalf if a service upgrade is needed.